| |  | | | CENTRAL LIBRARY | | Project | : | CENTRAL LIBRARY | | Details | : | Drainage & Water Services, Fire Protection System, Chilled Water, Ventilation & Air Conditioning, HV & LV Systems, UPS, Central Battery, Small Power, Lighting & Lighting Control, Emergency Lighting, Earthing & Bonding, Lightning Protection, AV, Public Address & Security Systems, Fire Alarm, Scada, External Services.
| | Location | : | Qatar | | Client | : | Qatar Foundation | | Architect | : | | | Contractor | : | Brookfield Multiplex Medgulf | |
| |
|
| |  | | | NDIA DUTY FREE WAREHOUSE | | Project | : | NEW DOHA INTERNATIONAL AIRPORT DUTY FREE WAREHOUSE | | Details | : | M&E works to Duty Free Warehouse and In-flight Duty Free Store. Including HVAC, Plumbing Fire Fighting, HV, LV, ELV, External Works and some Specialist Installations eg Master Clock, Terrestrial Trunked Radio, EVIDS etc.
| | Location | : | Qatar | | Client | : | NDIA Steering Committee | | Architect | : | | | Contractor | : | Zublin International | |
| |
|
| |  | | | AMBULATORY HEALTHCARE CENTERS | | Project | : | AMBULATORY HEALTHCARE CENTERS -AL AIN | | Details | : | Complete MEP package installation including internal & external services for HVAC, Plumbing, Fire Fighting Systems, Power, Lighting, ELV Systems (Public Address, CCTV, Fire Alarm, Access Control System, SMATV, Master Clock, Staff Attendance) & Medical Gas Installation. | | Location | : | Abu Dhabi | | Client | : | Abu Dhabi Health Services | | Architect | : | | | Contractor | : | Alpine Bau Deutschland AG | |
| |
|
| |  | | | ABU DHABI ISLAMIC BANK HEADQUARTERS | | Project | : | ADIB | | Details | : | Located on the old airport road leading to Abu Dhabi City, the development will house the Head Quarters of the Abu Dhabi Islamic Bank (ADIB). The project has an approximate total area of 60,000 square meters above grade and 40,000 square meters basement parking areas.
The development will comprise of two identical but mirrored 14 storey commercial towers above 4 levels of basement. Each tower has Ground, Mezzanine and 12 floors connected centrally by a shared Atrium space which serves as the main entrance to the development. ADIB HQ occupies in its entirety one of the towers with parts of the ground floor and associated shared atria/entrances. The project is currently targeting LEED ‘Gold’ certification.
Mercury is responsible for complete MEP installation, test and commissioning.
| | Location | : | Abu Dhabi | | Client | : | Abu Dhabi Islamic Bank | | Architect | : | | | Contractor | : | Al Habtoor Leighton Group | |
| |
|
| |  | | | BOROUGE 3 | | Project | : | BOROUGE 3 NPB | | Details | : | Complete MEP package design/build installation including: Internal & External Services for HVAC, Plumbing , Storm Water, Fire Fighting Systems, Steam, Plant Air, Instrument Air, Power, Lighting, ELV. | | Location | : | Abu Dhabi | | Client | : | Borouge | | Architect | : | | | Contractor | : | Alpine Bau Deutschland | |
| |
|
| |  | | | OMAN BOTANIC GARDEN PHASE IV | | Project | : | OBG IV | | Details | : | Complete MEP Services to Northern Biome and Southern Biome & Ancillary building | | Location | : | Oman | | Client | : | Diwan Of Royal Court | | Architect | : | | | Contractor | : | BAM International | |
| |
|
| |  | | | LUSAIL CITY | | Project | : | LUSAIL CITY PHASE I | | Details | : | Mercury has been contracted to provide the following infrastructure services: Natural Gas, Pneumatic Waste Services, Infrastructure Power, Tunnel Ventilation, Chilled Water and Potable Water.
| | Location | : | Qatar | | Client | : | Qatari Diar | | Architect | : | | | Contractor | : | Sinoyhydro | |
| |
|
| |  | | | GASCO HABSHAN 5 | | Project | : | GASCO HABSHAN 5 | | Details | : | Installation of HVAC systems to substations GASCO intend to expand its Habshan 5 oil & gas facilities. Mercury has been contracted to provide the HVAC systems to new substations
| | Location | : | Abu Dhabi | | Client | : | GASCO | | Architect | : | | | Contractor | : | Technimont JGC JV | |
| |
|
| |  | | | KNOWLEDGE OASIS, INFRASTRUCTURE PACKAGE | | Project | : | KNOWLEDGE OASIS, MUSCAT, INFRASTRUCTURE PACKAGE | | Details | : | Knowledge Oasis Muscat (KOM) is technology park dedicated to supporting technology business. KOM will house international call centers and blue chip companies with core facilities in 20,000 sq. m. office space. Mercury has been awarded the contract to carry out installation of pipe work & ETS controls to 3 nos. facilities.
| | Location | : | Oman | | Client | : | Tabreed | | Architect | : | A | | Contractor | : | Parsons | |
| |
|
| |  | | | KNOWLEDGE OASIS | | Project | : | KNOWLEDGE OASIS | | Details | : | Knowledge Oasis Muscat (KOM) is technology park dedicated to supporting technology business. KOM will house international call centers and blue chip companies with core facilities in 20,000 sq. m. office space. Mercury has been awarded the contract to carry out installation of District Cooling Plant for Tabreed District Cooling Scheme.
| | Location | : | Oman | | Client | : | Tabreed | | Architect | : | A | | Contractor | : | TAS | |
| |
|
| |  | | | BARWA COMMERCIAL AVENUE | | Project | : | BARWA COMMERCIAL AVENUE, TYPE 5 | | Details | : | Mercury has been awarded the contract to carry out complete install, test and commission of MEP services for Building Type 5, consisting of rental units and offices of 180,000 M2 in total | | Location | : | Qatar | | Client | : | Barwa Real Estate | | Architect | : | A | | Contractor | : | Hochtief | |
| |
|
| |  | | | BARWA CITY DISTRICT COOLING PLANTS | | Project | : | BARWA CITY DISTRICT COOLING PLANTS | | Details | : | Install, test & commission complete district cooling plant equipments including Chillers, AHU’s, pumps and cooling towers | | Location | : | Qatar | | Client | : | Barwa Real Estate | | Architect | : | A | | Contractor | : | TAS | |
| |
|
| |  | | | QATAR 2022 SHOWCASE STADIUM | | Project | : | QATAR 2022 SHOWCASE STADIUM | | Details | : | The Qatar 2022 stadium project is a showcase mock-up stadium for the upcoming selection process by FIFA for the 2022 World Cup. The arena providing an exhibition 500 seat 5-a-side football match in comfortable conditions in the Qatar summer- a prototype of Zero Carbon Energy Supply infrastructure which will include: solar heat collectors, Heat Storage/ buffer tank, Absorption chiller to convert the heat into chilled water with bio-fuel standby heating, Eutectic storage tank to store the cool & supply cooling to the showcase HVAC systems, Photovoltaic array & associated inverters and power infrastructure with mains power connection, appropriate distribution system, sufficient renewable energy to the arena & standby chiller and generator. This is the first time a built mock-up stadium has been constructed for the purpose of the selection process and this has attracted worldwide attention.
| | Location | : | Qatar | | Client | : | ES Group | | Architect | : | A | | Contractor | : | Mott Macdonald | |
| |
|
| |  | | | SOUTH SITE UTILITY TUNNEL | | Project | : | SOUTH SITE UTILITY TUNNEL | | Details | : | 20 km of service tunnel surrounding and supplying a huge demand of chilled and domestic water inclusive of fire protection through 50 km of pipework to the brand new Education City complex. A complex which is home to six universities, student campus and the most modern facilities. | | Location | : | Qatar | | Client | : | Qatar foundation | | Architect | : | KEO | | Contractor | : | ZUBLIN | |
| |
|
| |  | | | OMAN BOTANIC GARDEN-OMAN | | Project | : | OMAN BOTANIC GARDEN PHASE II | | Details | : | Oman Botanic garden is a new world class development which strives to celebrate research,cherish and preserve the unique habitats,environement and botanical heritage of Oman.The Project is designed according to LEED guide lines to be self sustainable and utilize green technology and building practices.When complete the site will be a major tourist attraction in the region.Mercury is responsible for complete MEP services for Phase II-Visitor Centres.
| | Location | : | Oman | | Client | : | Diwan Royal Court | | Architect | : | Alatec | | Contractor | : | Carillion Alawi L.L.C | |
| |
|
| |  | | | AL BUSTAN PALACE HOTEL - OMAN | | Project | : | AL BUSTAN PALACE HOTEL | | Details | : | The Albustan hotel was first opened in 1985 and since then has built a reputation as one of the finest hotels in Middle East.The hotel houses a spectacular 9 storey atrium,many exclusive guestrooms,fine resturants&bars,function rooms,swimming pool and other facilities.The Hotel has recently undergone a complete refurbishment prior to hosting the GCC Conference in December 2008.Mercury responsible for complete MEP services Strip out and refurbishment. | | Location | : | Oman | | Client | : | Oman Tourism Board | | Architect | : | A | | Contractor | : | Services and Trades | |
| |
|
| |  | | | ARCAPITA BANK HQ - BAHRAIN | | Project | : | ARCAPITA BANK | | Details | : | Bahrain Bay features the iconic new headquarters of Arcapita, a leading Bahrain- based international investment bank and the catalyst behind the community. For its own corporate headquarters, Arcapita chose to juxtapose the tall vertical icon tower of the Four Seasons Hotel, Bahrain with a horizontal glass structure. Framing the heart of Bahrain Bay, the two buildings set the benchmark of quality for design and materials.
| | Location | : | Bahrain | | Client | : | Bahrain Bay | | Architect | : | A | | Contractor | : | Nass/Murray&Roberts JV | |
| |
|
| |  | | | BAHRAIN WORLD TRADE CENTRE | | Project | : | BAHRAIN WORLD TRADE CENTRE (BWTC) | | Details | : | The project will house an extended retail centre of 100 units and 35,000m2 of prime office space in a twin tower commercial centre on the seafront side of an existing hotel. The total project is 121,000m2. The development will incorporate 1700 car parking spaces in the basement as well as in a multi-storey car-park.
| | Location | : | Bahrain | | Client | : | Bahrain World Trade Centre | | Architect | : | A | | Contractor | : | Nass/Murray&Roberts JV | |
| |
|
| |  | | | MEDICAL UNIVERSITY, BAHRAIN | | Project | : | MEDICAL UNIVERSITY OF BAHRAIN | | Details | : | Phase 1 – 33,000m2 of built area covering core teaching and admin facilities, dedicated medical school, indoor and outdoor sports facilities and student accommodation for up to 200 students.
| | Location | : | Bahrain | | Client | : | Royal College of Surgeons Ireland | | Architect | : | A | | Contractor | : | Aedas (UK) and MSCEB (Bahrain | |
| |
|
| |  | | | REGENCY TOWER | | Project | : | REGENCY TOWER | | Details | : | Complete MEP installation for the 28 storey Regency Tower, one of 12 towers provided by real estate developers specifically for DAGOC and the 15th Asian Games. | | Location | : | Qatar | | Client | : | Mr. Ibrahim Al Askmakh | | Architect | : | A | | Contractor | : | Ramco Trading | |
| |
|
| |  | | | SCIENCE & TECHNOLOGY PARK | | Project | : | STP | | Details | : | In late 2005, Mercury Engineering Qatar was awarded the complete MEP contract (shell and core plus fit out) for the Science and Technology Park within Qatar Foundation’s Educational City.
| | Location | : | Qatar | | Client | : | Qatar Foundation | | Architect | : | A | | Contractor | : | Contrack / Al Darwish JV | |
| |
|
| |  | | | MUSEUM OF ISLAMIC ARTS | | Project | : | PACKAGE 4 | | Details | : | MEP fit out contract for five specialist packages within the Museum of Islamic Arts, Doha, Qatar.
| | Location | : | Qatar | | Client | : | National Council for Culture Arts and Heritage | | Architect | : | Wilmotte and Associates | | Contractor | : | Mivan Depa | |
| |
|
| |  | | | MUSEUM OF ISLAMIC ARTS | | Project | : | PACKAGE 3 | | Details | : | Designed by the famous architect I.M.Pei and finished! This museum will house a vast selection of Islamic Art and historical artifacts. Mercury was awarded a €20 million contract to install the mechanical and electrical services.
| | Location | : | Qatar | | Client | : | Qatar Petroleum | | Architect | : | I.M.Pei | | Contractor | : | Baytur | |
| |
|